(11.30.2016) I have acquired another Scrambler project and it is in multiple pieces.
Due to that fact and limited space, I needed to be able to get this project into a rolling form so I could tuck it
away for a while, as the other one needs to also be put into a rolling fashion to free up a lot of space. I went
to work on getting the floor in and the rockers repaired. The front hands also needed addressing.
|
|
|
|
|
|
|
|
|
|
|
|
|
I moved along pretty good, although there was a lot of things I had to re-do and
tweak as we had 3 differnt vendors and parts/pieces from the original that were all goning together.
|
|
|
|
|
|
|
|
|
|
|
|
|
In the end, a lot of time and effort was done to get the body screwed together and put back on
the frame so it could be rolled into the other garage for the winter. The new Scrambler project is now in pieces in the garage
and I will get to that soon so I can get back to building this one. It has come a long way, but a lot more needs to be done to
get this to where it will be.
Check back soon for updates.
cb (11.30.2016)
|
|