(07.20.15) I have finished up the green part of the painting and next up is
the clear coating. I will start that tomorrow night hopefully.
|
|
|
|
|
|
|
There are 2 coats on there for full coverage. The pictures don't do it justice, in person,
it looks very wet and very green, I can't wait to see it in the outside light.
cb (07.10.15)
|
|
|
|
|
|
|
|
|
|
|
(07.16.15) Well, it appears it is mating season! The tub has finally found its way back
to its mate and they have been joined for what I hope is the last time during my tenure and oversight on it.
I took some time, cleaned the garage and really got everything cleaned up. I have most of the work bench back as well which is nice.
I plan on starting all the firewall installs and work next... heater, pedals, battery tray, those sorts of things. I just
have to clean them up and get them working right and painted first.
cb (07.16.15)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(07.22.15) Slowly the parts are going back on the Jeep, but other things have
been taking my time... the good news it is able to be moved and takes up a whole lot less space than it once
did. I still need to get to the fenders and hood and grille shell to get the nose back on it, but all in due
time.
cb (07.22.15)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(08.11.15) The new "smart phone" is officially making me lazy. It is a
whole lot easier to just upload to forums then it is to do my own website... very sad! So, I have to figure
a way to upload here and do it a lot easier and I will, but for now, let's catch up on the last couple weeks
as a lot of progress has been made.
The front clip is on and all the parts have been painted and cleared except for the hood, which will be this
weekend hopefully. I have picked up a rolling chassis Scrambler and trying to get a handle on that and figure
out what I want to accomplish with that.
cb (08.11.15)
|
|